C-TS413-2021 Dumps PDF 2023 Program Your Preparation EXAM SUCCESS [Q21-Q46]

Share

C-TS413-2021 Dumps PDF 2023 Program Your Preparation EXAM SUCCESS

Get Perfect Results with Premium C-TS413-2021 Dumps Updated 90 Questions

NEW QUESTION # 21
Which valuation category do you use to refurbish a material?

  • A. Retail
  • B. Origin
  • C. Condition-based
  • D. In-house/external procurement

Answer: C


NEW QUESTION # 22
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 3correct answers to this question.

  • A. Change the planned costs.
  • B. Create an invoice receipt for delivered materials.
  • C. Change the settlement rule.
  • D. Update the estimated costs
  • E. Lock or unlock the order.

Answer: B,C,E


NEW QUESTION # 23
You want to display vehicle-specific data for a piece of equipment. How do you proceed?

  • A. Assign a view profile to the combination of fleet object type and equipment category.
  • B. Define the field selection for the vehicle equipment master data.
  • C. Assign a view profile to an equipment category for fleet equipment.
  • D. Assign a view profile to the combination of fleet object type and usage type.

Answer: A


NEW QUESTION # 24
Which of the following are standard functionalities of SAP Asset Manager? Note: There are 3 correct answers to this question.

  • A. Technical objects
  • B. Cost analytics
  • C. Work orders and operations
  • D. Breakdown analytics
  • E. ESRI maps

Answer: A,C,D


NEW QUESTION # 25
The first release of SAP asset manager mobile application is based on

  • A. Windows only
  • B. ios and android
  • C. ios only
  • D. IOS,Android, Windows
  • E. Android only

Answer: C


NEW QUESTION # 26
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.

  • A. Order type
  • B. Completion date
  • C. Call object
  • D. Change documents
  • E. Maintenance activity type

Answer: A,B,C


NEW QUESTION # 27
What is the correct receiver object type for the settlement of arefurbishment order?

  • A. The material
  • B. The WBS element
  • C. The fixed asset
  • D. The cost center

Answer: A


NEW QUESTION # 28
In which cases are projects (PS) used in the area of SAP S/4HANAAsset Management? Note: There are 2 correct answers to this question.

  • A. Condition-based maintenance
  • B. Investments
  • C. Shutdowns and overhaul
  • D. External refurbishment

Answer: B,C


NEW QUESTION # 29
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers tothis question.

  • A. SAP Predictive Maintenance and Service
  • B. SAP Work Manager
  • C. Worker safety applications
  • D. SAP Asset Manager

Answer: A,D


NEW QUESTION # 30
Which objects can a personnel number be assigned to directly?Note: There are 2 correct answers to this question.

  • A. Business partner
  • B. Equipment
  • C. Planner group
  • D. Work center

Answer: A,B


NEW QUESTION # 31
The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planneddate if you set the shift factor for early completion to 100%?

  • A. It is not shifted.
  • B. It will be 5 days earlier.
  • C. It is postponed by 5 days.
  • D. It is postponed by a full cycle (100%).

Answer: C


NEW QUESTION # 32
Which steps are available for the maintenance technician when using the Report Malfunction tile? Note: There are 3 correct answersto this question.

  • A. View details of the technical object by navigating to the Asset Viewer.
  • B. Display the current location of the technical object.
  • C. Select and print the maintenance order shop papers.
  • D. Add a URL to provide further information.
  • E. Input estimated costs for repair malfunction.

Answer: A,B,D


NEW QUESTION # 33
A piece of equipment cannot be linked to a material. Determine whether this statement is true or false.

  • A. False
  • B. True

Answer: A


NEW QUESTION # 34
Which of the following statements are correct for SAP S/4HANACIoud - Asset Management? Note: There are 2 correct answers to this question.

  • A. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
  • B. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network.
  • C. You do NOT have access to the SAP S/4HANA back end system.
  • D. You have access to the SAP S/4HANA back end system.

Answer: A,C


NEW QUESTION # 35
What is the goal of embedded analytics in SAP S/4HANA?

  • A. Combine transactional and analytical processing.
  • B. Integrate SAP BusinessObjects Business Intelligence into SAP S/4HANA.
  • C. Combine the HANA database with SAP BW InfoProviders.
  • D. Integrate SAP BW into SAP S/4HANA.

Answer: A


NEW QUESTION # 36
You create two maintenance packages and only one package should be executed at a time. Which parameter determines this?

  • A. Package sequence
  • B. Hierarchy
  • C. Subsequent buffer
  • D. Offset

Answer: B


NEW QUESTION # 37
Which of the following is a prerequisite for external refurbishment?

  • A. Select the material group for externally refurbished materials.
  • B. Activate the subcontracting indicator in an external activity.
  • C. Create the purchasing info record for the external provider.
  • D. Define the order type for external refurbishment.

Answer: B


NEW QUESTION # 38
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question.

  • A. Plant Maintenance Information Systems (PMIS)
  • B. SAP Crystal Reports
  • C. SAP QuickViewer
  • D. SAP Lumira

Answer: B,D


NEW QUESTION # 39
You want to display additional document information within the document flow of a maintenance order. For which type of documentmust this be customized?

  • A. Invoice
  • B. Service entry sheet
  • C. Purchase order
  • D. Goods movement

Answer: D


NEW QUESTION # 40
How do you map a counter replacement in SAP S/4HANA Asset Management?

  • A. Deactivate the current counter and create a new counter.
  • B. Create a new measurement document and assign a valuationcode for counter replacement.
  • C. Replace the defective piece of equipment to which a counter is assigned.
  • D. Create a new measurement document marked as a counter replacement.

Answer: D


NEW QUESTION # 41
You want to create a new functional location. Which configurationsteps are required? Note: There are 2 correct answers to this question.

  • A. Define the functional location category.
  • B. Define the number range for the functional location category.
  • C. Define the structure indicator.
  • D. Define the reference functional location.

Answer: A,C


NEW QUESTION # 42
How does a performance-based maintenance plan calculate the interval between start date and planned date?

  • A. Cycle length divided by ((scheduling period) x (cycle modification factor))
  • B. Cycle length divided by monthly performance
  • C. Cycle length divided by (annual performance / 365)
  • D. Cycle length divided by annual performance

Answer: C


NEW QUESTION # 43
What can be determined using the offset within a maintenancestrategy?

  • A. The start date of the maintenance order
  • B. The cycle duration
  • C. The call date for the maintenance order
  • D. The first due date of a maintenance package

Answer: D


NEW QUESTION # 44
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question.

  • A. Book a goods receipt.
  • B. Cancel status Released.
  • C. Change the estimated costs.
  • D. Change the priority.

Answer: A,D


NEW QUESTION # 45
Which of the following statements about orders with operation account assignment (OAA) are correct? Note: There are 3 correct answers to this question.

  • A. The settlement rule is maintained on header level.
  • B. Overall costs are dynamically summed up on header level.
  • C. Costs are only stored for the operation object.
  • D. Purchase requisitions have the operation as account assignment.
  • E. A technical object must be assigned to an order operation.

Answer: B,C,E


NEW QUESTION # 46
......

C-TS413-2021 PDF Dumps Extremely Quick Way Of Preparation: https://www.testpdf.com/C-TS413-2021-exam-braindumps.html

Free C-TS413-2021 Exam Study Guide for the NEW Dumps Test Engine: https://drive.google.com/open?id=1_VcPcLZCMWPr1hO4lirZe870k4qDjomj