NEW QUESTION 14
What are some uses for the low-level code assigned to each material? Note: There are 2 correct answers to this question.

  • A. It is used by product costing to determine how costs are rolled up.
  • B. It is used by ATP to determine the priority of alternative components.
  • C. It is used in MRP to determine the sequence in which materials are planned.
  • D. It is used by engineering to identify sub items in an engineering bill of material(BOM).

Answer: A,C

 

NEW QUESTION 15
Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Please choose the correct answer.
Response:

  • A. Warehouse task
  • B. Outbound delivery request
  • C. Outbound delivery order
  • D. Warehouse order

Answer: B

 

NEW QUESTION 16
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.

  • A. Model a resource inbound in the location master.
  • B. Model a handling resource in the location master and goods receipt time in the mater all master.
  • C. Model a transportation resource in the location master.
  • D. Model a separate resource in the production data structure.

Answer: B,C

 

NEW QUESTION 17
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality?
Please choose the correct answer.
Response:

  • A. By providing cross-plant planning and deployment
  • B. By providing replenishment proposals with exact times
  • C. By providing future demands from demand figures in the past
  • D. By providing multilevel material requirements planning

Answer: B

 

NEW QUESTION 18
The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders" There are 2 correct answers to this question.
Response:

  • A. Setting a planning time fence in the Material Master Record
  • B. Assigning a production scheduling profile
  • C. Creating a planned order within the planning time fence
  • D. Manually changing the quantity of a planned order

Answer: A,C

 

NEW QUESTION 19
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. By material type
  • B. By period
  • C. By industry
  • D. By plant

Answer: B,D

 

NEW QUESTION 20
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

  • A. It is converted into a schedule line.
  • B. It is converted into a reservation.
  • C. It is converted into a planned order.
  • D. It is converted into a production order.

Answer: B

 

NEW QUESTION 21
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:

  • A. Planning horizon
  • B. Net change planning
  • C. Parallel processing across servers
  • D. MRP list

Answer: B

 

NEW QUESTION 22
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?

  • A. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
  • B. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
  • C. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
  • D. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator

Answer: B

 

NEW QUESTION 23
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.

  • A. Indicator Relevant for finite scheduling must be set.
  • B. PRT Availability check must be set.
  • C. Checking control must have an overall profile assigned in customizing.
  • D. Checking rule and group must be assigned.

Answer: A,C

 

NEW QUESTION 24
The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment?
There are 2 correct answers to this question.
Response:

  • A. Stock transfer
  • B. Vendor consignment
  • C. Subcontracting
  • D. In-house production

Answer: A,D

 

NEW QUESTION 25
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?

  • A. Minimum wait time
  • B. Queue time
  • C. Production time
  • D. Goods receipt processing time

Answer: B

 

NEW QUESTION 26
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?
Please choose the correct answer.
Response:

  • A. The requirements date occurs before that of a firmed planned receipt
  • B. A firmed planned receipt cannot be rescheduled
  • C. The requirements date occurs that of a firmed planned receipt
  • D. The requirement no longer exists

Answer: A

 

NEW QUESTION 27
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan?
There are 2 correct answers to this question.
Response:

  • A. Manually firm all planned orders for materials within the replenishment lead time of the material
  • B. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
  • C. In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material
  • D. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material

Answer: C,D

 

NEW QUESTION 28
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

  • A. Top of Yellow
  • B. Top of Green
  • C. Top of Red Base
  • D. Top of Red

Answer: B

 

NEW QUESTION 29
Which of the following data objects are updated when a user confirms an operation?
Please choose the correct answer.
Response:

  • A. Shop floor information system
  • B. Production order header status
  • C. Warehouse transfer order status
  • D. Production order total order quantity

Answer: A

 

NEW QUESTION 30
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • B. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • C. The lot size range must be within the lot-size range of the assigned routing.
  • D. The assigned routing must NOT have alternative sequences.
  • E. The assigned routing must be a rate routing.

Answer: A,B,C

 

NEW QUESTION 31
Which of the following apply to MRP Live?
There are 2 correct answers to this question.
Response:

  • A. The sequence of planning materials is calculated across plants.
  • B. The definition of the planning scope is more flexible.
  • C. The BAdIs for classical MRP also apply to MRP Live.
  • D. Planned orders need to be converted to purchase requisitions for externally procured materials.

Answer: A,B

 

NEW QUESTION 32
Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics?
There are 3 correct answers to this question.
Response:

  • A. Drilldown
  • B. Filters
  • C. Sort
  • D. Scheduling
  • E. Forecast

Answer: A,B,C

 

NEW QUESTION 33
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Run PP/DS heuristics for repetitive manufacturing.
  • B. Run MRP with quota arrangement.
  • C. Run MRP with automatic selection of production version.
  • D. Assign planned orders manual lying the planning table.

Answer: A,B

 

NEW QUESTION 34
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.

  • A. Product-related
  • B. Order-related
  • C. Milestone-related
  • D. Cost-related

Answer: A,B

 

NEW QUESTION 35
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.
Response:

  • A. Production Version
  • B. Engineering Change Record
  • C. Bill of Material
  • D. Routing

Answer: A,C,D

 

NEW QUESTION 36
Which of the following is a valid sequence of the main activities in product on order processing?

  • A. Creation, release, scheduling, material withdrawal, confirmation
  • B. Creation, staging, release, material withdrawal, confirmation
  • C. Creation, scheduling, release, material withdrawal, confirmation
  • D. Creation, scheduling, release, variance calculation, confirmation

Answer: C

 

NEW QUESTION 37
What are the possible results of a production planning run in Advanced Planning (PP/OS)? Note: There are 3 correct answers to this question.

  • A. Scheduling agreement schedule line
  • B. Purchase requisition
  • C. Planned order
  • D. Production order
  • E. Stock transport order

Answer: A,B,C

 

NEW QUESTION 38
......