NEW QUESTION 34
To be of value the Inspector's documentation must be:

  • A. Timely, accurate and concise
  • B. Submitted before the end of the job
  • C. Always handwritten
  • D. Always typewritten

Answer: A

 

NEW QUESTION 35
Corrosion generally occurs at which of the following sites:

  • A. Cathode
  • B. Electrolyte
  • C. Metallic pathway
  • D. Anode

Answer: D

 

NEW QUESTION 36
ISO SA 3 is directly equivalent to:

  • A. NACE No. 1/SSPC SP 5
  • B. NACE No. 2/SSPC SP 10
  • C. NACE No. 3/SSPC SP 6
  • D. None of the above

Answer: D

 

NEW QUESTION 37
A magnetic pull-off type gauge is a good choice when:

  • A. Accuracy is not required
  • B. When an intrinsically safe tool is required
  • C. Performing an adhesion test
  • D. When working on non-ferrous metals

Answer: B

 

NEW QUESTION 38
Stripe coats are generally applied to:

  • A. Welds
  • B. Edges and corners
  • C. a), b), and c)
  • D. Complex geometric shapes

Answer: C

 

NEW QUESTION 39
If inspectors identify issues of non-conformance during an inspection, they should

  • A. inform both the Contractor and the inspector's supervisor so they can take appropriate corrective actions
  • B. perform additional tests secretly to ensure there are no other potential issues at the site
  • C. instruct the contractor's personnel in how to correct the issue so the project is not delayed
  • D. wait until the final report is being prepared to identify the issues in writing so they are fully documented

Answer: A

 

NEW QUESTION 40
Safety Data Sheets must be carefully reviewed by:

  • A. The Application personnel
  • B. The Owner's personnel
  • C. The Inspection personnel
  • D. All personnel involved in the job

Answer: D

 

NEW QUESTION 41
You are the NACE Inspector on a job where ISO ST 3 has been specified. The Contractor normally works to SSPC standards and been referencing SSPC SP 3.
Could this have any impact on the final surface preparation appearance?

  • A. It depends on which hand tool the Contractor selects
  • B. Yes, because the 'two standards are not equivalent
  • C. It depends on which power tool the Contractor selects
  • D. No, because there is no real difference in the standards

Answer: D

 

NEW QUESTION 42
Check abrasive blast pressure close to the

  • A. compressor
  • B. blast pot
  • C. blast nozzle
  • D. substrate

Answer: C

 

NEW QUESTION 43
An inspectors personal log book should contain:

  • A. Subjective comments re ding the application team
  • B. No comments regarding the application team
  • C. The inspector's personal opinions of the application team
  • D. Objective comments regarding the application work

Answer: B

 

NEW QUESTION 44
Upon arrival of coating materials, the inspector should

  • A. review coating contractors' plans for storage of coating materials and confirm they meet national, local and owners' fire and environmental regulations.
  • B. observe aryl document that the applicator WFT at regular intervals during application.
  • C. observe and document the amount of material and batch numbers.
  • D. observe and document time frame and environmental conditions between each coat.

Answer: C

 

NEW QUESTION 45
It is good practice for the NACE Inspector to have instrument calibration certificates available:

  • A. At all times
  • B. Only if the specification requires it
  • C. In the office only
  • D. In the field only

Answer: A

 

NEW QUESTION 46
You are the NACE Inspector on a tank lining project where a 50% solids epoxy tank lining is being applied. After application of the 19 coat you notice small blisters in some areas of the applied lining.
Your FIRST preferred course of action is to:

  • A. Document the problem and advise the Contractor and Owner's representative
  • B. Break the blisters to see what's inside
  • C. Document the problem and advise the Contractor
  • D. Extract any liquid that may be inside the blister and send it to the lab for further analysis

Answer: A

 

NEW QUESTION 47
The form of corrosion that has the largest potential for unexpected catastrophic failure is:

  • A. Atmospheric Corrosion
  • B. Galvanic Corrosion
  • C. General Corrosion
  • D. Localized Corrosion

Answer: B

 

NEW QUESTION 48
SSPC SP 1 identifies the use of:

  • A. A wide variety of materials
  • B. Inorganic solvents
  • C. Organic solvents
  • D. Biodegradable detergents

Answer: A

 

NEW QUESTION 49
How many gauge readings does SSPC-PA 2 require within a 4 cm (1.5 inch) diameter circle?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 50
According to SSPC PA 2 a Spot Measurement is:

  • A. A single gauge reading
  • B. The average of all spot measurements in a given area
  • C. The overall average of all readings
  • D. The average of gauge readings taken in a 4cm (1.5 inch) circle

Answer: D

 

NEW QUESTION 51
Daily reports are important because:
Select All That Apply

  • A. Management uses them to make personnel decisions.
  • B. the information impacts future projects.
  • C. The information aids communication with supervisors.
  • D. Inspectors rarely change on a project.

Answer: A,B,C

 

NEW QUESTION 52
Excessive working of the surface with a power grinder can be detrimental because excessive burnishing

  • A. develops a polished surface, which is a poor anchor profile for most coatings
  • B. scratches the surface too deeply resulting in uneven coating application
  • C. damages structural elements thereby speeding up the corrosion process.
  • D. develops a good anchor profile resulting in uneven coating application.

Answer: A

 

NEW QUESTION 53
Good records can provide maintenance departments with detailed information about ALL of the following EXCEPT

  • A. when the coating will be reapplied.
  • B. how the item was coated.
  • C. what items were coated.
  • D. what materials were used.

Answer: B

 

NEW QUESTION 54
The main responsibilities of the inspector are to

  • A. observe and direct the work of the contractors.
  • B. direct and perform the work stated in the specification.
  • C. demonstrate to the contractor how to apply the coating.
  • D. observe and report the quality of the work performed.

Answer: D

 

NEW QUESTION 55
You ate the NACE Inspector on a job where NACE No. 2/SSPC - SP 10 has been specified. You are finding the Contractor is leaving mill scale on the on surface and as a result you have been rejecting the blast. The Contractor is very upset and has told you that the standard permits up to 5% of the mill scale to remain and still be in be in compliance with the standard.
Your FIRST preferred course of action is to:

  • A. Permit coating to take place so as not to lose the blast
  • B. Shut the job down
  • C. Review the relevant standard with the Contractor
  • D. Call your supervisor

Answer: C

 

NEW QUESTION 56
......